Do I need a permit to install a driveway?

Refer to Municode link; Appendix D Roadway and Drainage Standards Article 8 Section 8.6.3 

All driveway and/or drainage connections to and/or across public right-of-way shall require a permit. The pipe size and invert depth of all side drains/driveways culverts shall be determined by the County Engineer or their designee. Driveway connections shall be constructed with a minimum of six (6) inches of reinforced concrete (three thousand (3,000) psi). Swale driveways may be allowed, if approved by the County Engineer or their designee. In cases where the driveway connection is approved to not require a pipe, the driveway shall conform with the existing flow line of the roadside swale, or as established by the County Engineer or their designee. 

Codes and Ordinances

Show All Answers

1. Do I need a permit to install a driveway?
2. Where do I get a permit from?
3. How do I pay for my permit?
4. How long is a Right of Way / Driveway Permit good for?
5. What is the number to Sunshine State One Call (Call before you dig)?
6. What gives the County the right to dig up my front yard?
7. How much does a driveway permit cost?
8. What are the specifications for constructing my driveway?