Nassau-Ameila Utilities Inspection Request Form

  1. Name of Project (as appears in the approved construction drawings) and phase (if Applicable):

  2. Scheduled (to be determined by NAU)

  3. All water and sewer main stub connections are to be performed by utility contractor or licensed master plumber and must be scheduled at least 5 days in advanced with NAU. In addition, it is the engineer of record's responsibility to secure applicable FDEP permits in accordance with NAU permitting procedures.

  4. If the connection cannot be executed at the schedule time, the applicant must reapply for a new main stub request. Please note that reapplying may require an additional 5 days for rescheduling.